Score every factory the same way.

The failure mode in a multi-factory trip is that each visit gets remembered differently. Six dimensions, scored pass / flag / fail, turns impressions into a comparison you can act on.

TOOL · SCORECARDPhoto pendingBuyers inspecting shrink-wrapped equipment staged for shipment beside a loading area.

How to score

Three levels, not a number out of ten.

A numeric score implies precision the visit does not have. Pass / flag / fail is enough to make the decision, and harder to game.

Pass means the evidence is there and you saw it. Flag means something is missing or conditional and needs a follow-up. Fail means the evidence contradicts what you were told. Most factories land somewhere in the middle — the scorecard's job is to make the pattern visible, not to produce a single comforting number.

It is the same distinction as a factory visit, an audit and an inspection — three different questions, and only one of them is what we run.

The six dimensions

What to check, and what counts as each level.

  • Licence and scopeDoes the registered business actually make this product? Pass: the licence lists manufacturing and the scope matches. Flag: the scope is broad but not specific to your category. Fail: the licence says wholesale or retail, or belongs to a different entity.
  • Floor and equipmentCan the line hold your volume, and is it theirs? Pass: the line for your product exists and is running. Flag: the right equipment is present but not running your product. Fail: no equipment — a showroom, a catalogue and a sample table. See the on-the-floor checklist.
  • Quality controlHow are failures caught, and what happens to them? Pass: a real QC bench, in-line checks and a record of defects. Flag: QC exists but nothing is written down. Fail: no QC, or "we never have defects", which is the same thing.
  • Decision-makerIs someone in the room who can agree terms? Pass: the production manager or owner answers directly. Flag: a sales rep answers but defers on numbers. Fail: "the boss is travelling", which we record as a failed visit.
  • SubcontractingWhich steps are outsourced, and to whom? Pass: key processes are in-house and stated. Flag: some steps outsourced but disclosed. Fail: a step you were told is in-house turns out to be subcontracted — the classic trading-company tell.
  • Commercial fitMOQ, lead time and tooling ownership in writing? Pass: all three stated, with the tooling ownership explicit. Flag: agreed verbally only. Fail: evasive on MOQ, or the payment entity does not match the licence.

This is the same scoring we run on an existing-supplier visit — the six dimensions travel with you, so every factory gets measured the same way.

Reading the result

What the scores actually mean.

How to read it

  • Any fail means fix it before you commit — a licence fail or a decision-maker fail is not a negotiation problem, it is a walk-away.
  • Flags are follow-up questions, not rejections. One flag is normal; three flags is a pattern.
  • Score all six for every factory, even the one you already like — the point is the comparison, not the favourite.

The licence and scope dimensions mirror the five checks we run before a factory stays on an itinerary, so the scorecard and the vetting method agree rather than duplicate.

Next step

Score your shortlist with someone on the ground.

Tell us the category and the shortlist. We will run the visits and the scoring.

No obligation. We reply within 1 business day, China Time (GMT+8).

Reply within 1 business day

Plan visit